Solar Process
Solar Process
• Site Survey:
You will receive a call to schedule the site survey within 5 days of contract signing. At this visit we will gather all measurements from roof and wall space.
• Panel Layout Approval:
Customer approved panel layout. HOA approved panel layout (if required).
• Design/Engineer Package:
Permit Engineering package will be ordered including structural and electrical stamp (if necessary); typically takes 3-5 days.
• Solar / Storage Permit:
Permit application may take 5 - 30 days.
• Installation Schedule:
Discounted Solar will schedule the installation appointment with you. Installation typically takes 2-3 days. If required, Main Service Panel upgrade (MPU) and/or an Energy Storage System (ESS) will take longer. We don't "hurry threw jobs" like others. We take our time to ensure quality.
• Monitoring:
Set up account and install your new solar system monitoring APP.
• Inspection:
We will coordinate with the building department and utility company to schedule MPU inspection and/or installation inspection.
• PTO:
Permission to Operate / Interconnection Approval will be submitted! We wait for a response to complete the solar process!